GR + exam 47C + exam 47P
One complete course for the ICC Reinforced Concrete Special Inspector certification: General Requirements, the 47C codes exam, and the closed-book 47P plans exam.
$149.99
180 days of online access
Renew 90 days for $39.99
Covers General Requirements, exam 47C (codes, open book), and exam 47P (plans, closed book) in one course.
Built on the references ICC lists for the Reinforced Concrete exams: ACI 318-19, the ICC Concrete Manual, and the referenced ASTM standards, plus the IBC for General Requirements.
GR
Special Inspector General Requirements
25 questions · 1 hour
Open
47C
Reinforced Concrete Codes
60 questions · 2 hours
Open
47P
Reinforced Concrete Plans
30 questions · 1 hour 30 minutes
Closed
How the IBC frames special inspection, and what has to be in place before the concrete arrives.
How exam 47C is put together, and how ACI 318-19, the ICC Concrete Manual, and the referenced ASTM standards fit next to each other.
Special inspection duties, the statement of special inspections, and what the chapter expects to be verified.
Cement, aggregates, water, and admixtures, and how a mix is specified on the job.
Grades, sizes, laps, covers, supports, and the checks an inspector makes before the pour.
What to look at on forms before concrete is placed, including cleanliness, stability, and embedded items.
Sampling, slump, temperature, air content, and making cylinders, tied to the referenced ASTM standards.
Placement, consolidation, joints, finishing, curing, and the extra checks when the weather turns.
What a special inspection report needs so the record matches the work you watched.
How a structural set is organized, and where to start when the exam is closed book.
The notes that govern the sheets: design criteria, abbreviations, and the lines that change a detail.
How to read a schedule, a mark, and a callout, and how to trace a bar from the schedule to the sheet.
Walls, slabs, beams, footings, and the typical details that show up again and again.
How a drawing relates to ACI 318-19 and the ICC Concrete Manual when you cannot open the book.
What to do when a plan, a detail, and a note disagree, and how inspectors flag it.
A closed-book plan for exam 47P: what to learn cold, what to scan first, and how to use the clock.
A tight sheet of the limits, definitions, and field checks to review before exam day.
Timed question sets in the shape of 47C (open book) and 47P (closed book), with answers you can check against the references.