The sand-cone test (ASTM D1556) measures the in-place density of compacted soil. It is on ICC's reference list for the ECC Soils Codes exam, and fill testing is the largest part of that exam's outline. The idea is simple: dig a hole, weigh the soil you took out, and find the hole's volume by filling it with sand whose density you already know.

How the test works in the field

  1. Level the test surface and seat the base plate.
  2. Dig a hole through the plate, saving every bit of the removed soil in a sealed container so it does not lose moisture.
  3. Invert the sand-cone apparatus on the plate, open the valve, and let the calibrated sand fill the hole and the cone.
  4. Close the valve and weigh the jar again. The weight lost is the sand that went into the hole plus the cone.
  5. Weigh the removed soil and get its moisture content (for example by oven drying, or a rapid method such as D4959).

Two calibration values come from the lab beforehand: the mass of sand that fills the cone and plate, and the bulk density of the sand.

Worked example

Given: jar + sand before = 15.40 lb, after = 8.95 lb. Sand needed to fill the cone and plate = 3.20 lb. Sand bulk density = 92.0 lb/ft³. Wet soil removed from the hole = 4.10 lb. Moisture content = 9.5%. Lab maximum dry density (ASTM D1557) = 112.0 lb/ft³. Required compaction: 90%.

1. Sand used           = 15.40 − 8.95          = 6.45 lb
2. Sand in hole        = 6.45 − 3.20           = 3.25 lb
3. Hole volume         = 3.25 ÷ 92.0           = 0.0353 ft³
4. Wet density         = 4.10 ÷ 0.0353         = 116.1 lb/ft³
5. Dry density         = 116.1 ÷ (1 + 0.095)   = 106.0 lb/ft³
6. Relative compaction = 106.0 ÷ 112.0 × 100   = 94.6%  →  passes 90%

Where people lose points

  • Forgetting to subtract the cone. The sand that stays in the cone is not in the hole. Skip step 2 and the volume comes out too big, so the density comes out too low.
  • Dividing moisture wrong. Dry density = wet density ÷ (1 + w), with w as a decimal (9.5% = 0.095). Not wet density × 0.905.
  • Comparing to the wrong Proctor. Use the maximum dry density the project specifies, standard (D698) or modified (D1557). Modified gives a higher maximum, so the same field result is a lower percentage.
  • Ignoring oversize particles. If the field sample has a lot of gravel the lab curve was not run on, ASTM D4718 corrects the numbers.

Quick answers

What is the formula for the sand cone test?
Hole volume = (sand used − sand in cone) ÷ sand bulk density. Wet density = wet soil mass ÷ hole volume. Dry density = wet density ÷ (1 + moisture content as a decimal). Relative compaction = dry density ÷ maximum dry density × 100.
Which ASTM standard covers the sand cone test?
ASTM D1556/D1556M, Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method. It is on ICC's reference list for the ECC Soils Codes exam.
Why do you subtract the cone correction in a sand cone test?
Part of the sand released fills the cone and base plate, not the hole. That calibrated mass is subtracted so only the sand in the hole is used to compute its volume.

Sources